1. Cylinder block used with LR certificate -
outside body, water part and air reservoir after
sand blasting and painting.
2..Main bearing pockets - measurement of
pocket diameters, centerline checking with a
laser. Measurement records.
3. Cylinder liners used after honing - outside sand
blasting and painting. Diameter measurements.
Measurement records.
4. Pistons used after glass blasting - the piston
grooves dimensions:
First groove grinded of the oversize of 0.5 mm,
other dimensions nominal. The measurement of
diameters and grooves. Cards measurements. -
Installation of new rings.
5. Connecting rods used checked after regeneration
6. Cylinder heads used after recondition, sand
blasting and painting, pressure test 6 bar - new
valve seat inserts and spindles
7. Camshaft used - installation with new bearing
shells.
8. Crankshaft after grinding - all journals and pins
grinded on undersize 0,4 mm with LR certificate -
installation with new bearing shells
9. HP fuel pumps - used. Installation new
plungers and barrels and non return valves.
10. Suspended pumps - water, lube oil, fuel
oil - used after overhaul - installation with new parts
11 Vibration damper after overhaul in a
specialize workshop with certificate.
12. Turbocharger after overhaul - Installation with
new bearings
13. Air cooler - used after overhaul and pressure 6bar test
14. Starting valve used after overhaul
15. Injection valves - used after overhaul,
installation with secondhand endings.
16. Exhaust manifolds - new insulation
17. Speed governor Woodward UG-8 after
overhaul with certificate
18.Thermometers, pyrometers new
19. Electrical installation
20. Besides all seals and O-rings to be renewed.
21. Engine without test bench